- a combined reinforced-concrete load-bearing system complemented by load-bearing walls of ceramic masonry
- reinforced-concrete ceiling slabs
- walls between individual apartments – monolithic reinforced-concrete walls, or acoustic ceramic masonry
- interior partition walls – ceramic masonry or aerated concrete
WALL AND CEILING FINISHES
- gypsum plaster with a hygienic white coating
- ceilings – gypsum plaster with white paint
WINDOWS AND BALCONY DOORS
- aluminium, thermally insulating triple glazing, clear glass, Velux roof windows
- window sills (interior plastic / exterior sheet metal)
- interior plastic handles
DOMESTIC HOT WATER AND HEATING
- water heating provided by central supply from the building's gas boiler room and from heat pumps
- individual heat metering for each apartment
- radiator heating (underfloor heating on request)
- interior temperature regulation controlled via a thermostat
- electricity meters for individual apartments are located in a dedicated space accessible from the exterior
- the high-current electrical distribution board with the main circuit breaker is located in the hallway of each apartment, with a 400 V connection point in the kitchen
- lighting outlets designed in each room will be terminated in accordance with the applicable STN standard (the supply of light fixtures and bulbs themselves is not part of the standard)
- interior temperature regulation controlled via a thermostat
- sockets and switches will be installed completely in all rooms in accordance with the project documentation
- low-current connection via a single socket in each apartment / non-residential unit
- complete water and sewage distribution
- hot- and cold-water consumption meters
- kitchen-unit water and waste piping run along the wall